Projects
Year 2008 - 2011 Project List
Web Server - Upgrade to OS and capacity
- Implementation of Content Management Solution
- Database Server, Test Database Server upgrade
Voice Mail replacement and upgrade:
- Hardware replacement
- Unified Messaging
- Software upgrade
Network switch replacements/upgrades (age of equipment is a major factor):
- Router upgrade and monitoring of connectivity issues
- Replacement of 10mb switches with 100mb/1Gb switches
Local Dial Tone, local, toll and Long Distance calling service
- Existing contract with McLeod is expiring 2/23/2010.
T1 Strategy
- T1 for Internet Access, Web site, and email (independent vs TLN shared)
- Voice and Data T1's to Senior, Ice, and DPS
- Combine Ice Arena and Senior Center voice and data connection
- Digital / Microwave T1 options with City radio dispatch system (Test w/ Fire, Rec.)
Integrated email/notification/calendar/scheduling Software
- Email Collaboration software upgrade for calendar and appointments
- Multiple reminders to multiple people
- Scheduling meetings at various facilities
- Must be PDA compatible
Server Replacements: Hardware and software
- Migrate from NT4 domain to active directory domain authentication
- Implement internal DNS server
- Continue implementation of Windows 2003/2008 Server
- (CH2-bdc, DPS-bdc, CH1-pdc)
Computer replacement program: Hardware and software replacement:
- Continue implementation of Windows XP Pro (Vista Capable)
- or other open systems platform?
- Office Software – (Backward file format compatibility between MS-Office releases;
2007 vs ( XP, 2003, 2000, 97 are compatible with the exception of MS-Office '97 Access database. )
- 20% Replacement/Upgrade program (5-10 PC's per month)
Building / Permits / Code Enforcement Applications - BS&A .net upgrade
- Upgrade BS&A to new dot net version which will provide web-browser based system.
- Mobile / Wireless Broadband implementation with Laptops for inspectors and enforcement officers. Printing.
Wireless cost = $50-60/Month per unit; 15 units = $900 - 1,050 per month
- Beaumont Hospital - Document plan review process and internet hosting
- BS&A - Building Permits Application annual maintenance
City Clerk Business Licensing and Animal Licensing Applications - BS&A
- Software application (Does not include any customization costs)
- Pervasive.Sql Licensing $1,195
- $ 200/hr for data conversion, configuration, Implementation
- $ 900/day for on-site training + $50/hr travel + overnight accommodations
estimated at 3 days
Daily Treasurer's Report Interface & Credit Card payments
- Integrate Comcash system to daily JE in Finance system
- Integrate Credit/Debit card payments with cash drawer system
Fire Station Requests
- Laptops for deputy chief and EMS coordinator.
- 4 Laptops for fire software application (toughbooks).
G.I.S.- Geographical Information Systems commitment of resources:
- ESRI Software upgrades
- Planning department computer upgrade
- CAMS integration with Oakland County
- Engineering GIS training
Web Enabling (Public Internet):
- Web-based or service based credit card payments. Official Payments.
- Content Management system
- Use php-mysql where appropriate to provide dynamic content to databases.
(ie. Sidewalk special assessments)
Web Enabling (Private Intranet):
1. Use php-mysql where appropriate to provide dynamic content to databases.
Migrate from MS-Access front-end to php coding.
2. Research threaded discussion groups for best practices.
Annual and Other Projects in motion
Windows Server Update Services
- Manage the deployment of the latest Microsoft product updates
- Test product updates safely before releasing to network
- Managed updating and status reporting
Delinquent Water Processing - January 1 - March 5, 2010
- Delinquent account determination
- Penalty processing and delinquent letter notification
- Final penalty processing and County update
Board of Review processing; January - March, 2010
- Appointment Scheduling, Reporting and Forms"
- Case Review processing and Board updates
- County updating
Asset / Computer Inventory Control / Project Tracking
- Requirements - Brainstorming sessions
- Design phase
- Diagrammatic modeling
- Database design
- User Interface design
- Reporting
- Search / Inquiry requirements
Court Digital audio recording system
- 2 high workstations; one for each court room to interface with audio system
- Equipment interface and software installation and employee training
Court – Judicial Data Warehouse (JDW) system
- Michigan Statewide Judicial Data Warehouse
- Site Survey form to be completed by April 2007
Performance Management Guidelines Committee database
- Requirements - TBD
- Design phase - TBD
Call Detail Reporting and Management
- Manage and Track Cellular calls
- Manage and Track Regular calls for all department
- Design and produce call detail reports and invoicing
Library Server upgrades
- 2003/2008 Server
- Group Policies
- Windows Server Update Services
Disaster Recovery / Contingency Service
Document and Email Rentention and legislative changes
- Printer-friendly version
- 1906 reads